New Piping Line Development

Here is the new developed piping line for fermentation section. All pipes are connected with trip clamp. The only work during installation is piping connection, no welding necessary any more. This lowers the time and labor cost very much. You can imagine the work like a idiot working. 

More information please view here.

评论

此博客中的热门博文

The Craft Brewery System: A Revival of Flavors and Community

The Development Of Beer Culture

What’s the Difference Between Dry Beer and Draft Beer?